Community Arts Centre

LocationLagosYear2025TypeCulturalArea1,600 M²StatusCompleted

Brief

A neighbourhood arts centre with a black-box theatre, workshop spaces and a public courtyard, on a tight urban infill site.

Problem

The theatre needed acoustic isolation while the workshops needed to feel porous and visible to the street — two opposite ambitions in one small footprint.

Signature Drawing

A B C D 1 2 3 520 320 BLACK BOX THEATRE340 m²WORKSHOP WRAP620 m²PUBLIC COURTYARD280 m²GREEN ROOM / BACK OF HOUSE120 m² N 1:100
FFL +0.000 1:100
1:100
N
N

Click a room in the plan for detail.

Spatial Concept

The building reads from outside as a quiet volume hiding a loud one — a deliberate inversion of a typical theatre façade.

Material Strategy

Board-formed concrete for the theatre box, steel-framed glazed screens for the workshop wrap, a perforated metal scrim over the street façade.

Environmental Response

The workshop wrap is naturally ventilated year-round; only the sealed theatre box is mechanically conditioned.

Outcome

The workshops are visible from the street at all hours, which the Trust credits with tripling casual foot traffic into programmes.

Project Metadata

ArchitectEdificeStructural EngineerBalogun & PartnersClientLagos Cultural TrustArea1,600 M²StatusCompletedYear2025LocationLagos

Timeline

Brief

Trust & artist consultation

Site

Acoustic & noise survey

Concept

Box-in-wrap studies

Design

Acoustic isolation detailing

Documentation

Construction drawing set

Construction

18 months on site

Completion

Opening festival

More From the Archive

ALL PROJECTS →

EVERY PROJECT STARTS WITH A QUESTION.

START A CONVERSATION →